      玻璃鋼防腐管道安裝要求
      時間:2022-07-05  瀏覽:5677次

        Requirements for installation of FRP pipes

        1、玻璃鋼防腐管道在安裝前應對設備管口、預埋件、預留孔洞、鋼結構等涉及管道安裝的內容進行復核。

        1. Before installation, the pipeline shall check the contents concerning the installation of the pipeline, such as the nozzle of the equipment, the embedded parts, the reserved holes and the steel structure.

        2、管道的坡度應按圖紙的要求進行調整,調整方法可以利用支座達到坡度要求,焊縫應設置在便于檢修、觀察的地方。

        2. The gradient of the pipeline should be adjusted according to the requirements of the drawings. The adjusting method can use the support to meet the gradient requirements. The welding seam should be set in a place convenient for maintenance and observation.

        3、與傳動設備連接的管道,安裝前內部要處理干凈,焊接固定管口一般應遠離設備,以避免焊接產生應力對傳動設備安裝精度的影響。

        3. The pipeline connected with the transmission equipment should be cleaned before installation, and the fixed pipe mouth should be far away from the equipment to avoid the influence of welding stress on the installation accuracy of the transmission equipment.

        4、管道與機器連接前,應防止強力相對,在自由狀態下檢查法蘭的平行度和同軸度。

        4. Before connecting the pipe with the machine, the relative strength should be prevented, and the flange's parallelism and coaxiality should be checked under the free state.

        5、安全閥應垂直安裝,在投入試運行時,要及時調校安全閥。安全閥的調校在系統上進行,開啟和回座壓力要符合設計文件的規定。

        5, the safety valve should be installed vertically, and the safety valve should be adjusted in time for commissioning. The final adjustment of the safety valve is carried out on the system, and the opening and returning pressure must conform to the design documents.

        6、閥門安裝前,按設計文件核對其型號,并按介質流向確定其安裝方向。當閥門與管道以法蘭或螺紋方式連接時,閥門應在關閉狀態下安裝;如以焊接方式安裝時,閥門不得關閉。

        6. Before installing the valve, check its model according to the design document and determine its installation direction according to the medium flow direction. When the valve and pipe are flanged or threaded, the valve shall be installed in a closed state; if installed in a welded way, the valve shall not be closed.

        7、儀表元件的臨時替代:所有儀表元件安裝時,均采用臨時元件替代,等試壓、沖洗、吹掃工作結束后,投料前再正式安裝。

        7. Temporary substitution of instrument components: All instrument components are installed with temporary components, and are formally installed before feeding after pressure test, flushing and purging.


      主站蜘蛛池模板: 午夜宅男影院| 国产精品久久777777| 亚洲欧美偷国产日韩| 鲁鲁免费国产高清在线观看| 国产一区二区一卡二卡| 91福利社| 成人卡一卡二| 成人3D动漫一区二区三区| 国产精品国产三级国AV| 福利一区福利二区微拍刺激| 国产成 人 综合 亚洲奶水| 亚洲AV日韩AV高清在线观看| 日本国产精品第一页久久| 亚洲欧美熟妇久久久久久久久| 精品卡通动漫亚洲AV第一页| 亚洲日逼| 亚洲啪啪精品一区二区的| av中文字幕国产精品| 无码国产69精品久久久久app| www.色小在线精品| 久久综合久久自在自线精品自| 无码抽搐高潮喷水流白浆| 色狠狠色噜噜AV一区| 苍井空一区二区三区在线观看| 熟女中文字幕| 亚洲日本韩国欧美云霸高清| 久久91精品国产91久久麻豆| 日韩欧美人成在线观看| 欧美日韩不卡视频合集| 日韩人妻精品中文字幕专区| 在线中文字幕国产一区| 亚洲AV秘 无码一区二区三区一| 国产91人妻人伦a8198v久| 亚洲无吗av在线播放| 国产视频资源在线观看| 久久在线视频免费观看| 国产精品一区二区三区性色| 国产亚洲精品成人aa片新蒲金| 亚洲日韩av无码一区二区三区人 | 国产AV无码专区亚洲AV漫画| 亚洲AV无码一区二区三区高潮|